The Road Development Authority (RDA) has begun installing protective metal railings at hazardous bends and steep sections of major roads in Nuwara Eliya District, Hiru News reported on Sunday 22 November.
The work is being carried out by the RDAโs Norwood office. Hiru says the installation follows international standards and technology.
Roads covered
- The Hatton-Colombo main road, from Kitulgala to Talawakelle.
- The Talawakelle-Pundaluoya road.
- The Sri Pada route via Ginigathhena and Diyagala.
Timeline and reason
Nuwara Eliya District Development Committee Chairman and MP Manjula Suraweera Arachchi said 10.5 km of railings are expected to be in place before the end of this year. He said the decision followed the high number of road crashes on these routes in recent times, and that the work is being expedited ahead of the 2026/2027 Sri Pada pilgrimage season.
The railings will also carry reflective features so that drivers can see them clearly at night, according to the report.
The district administration briefed state and private-sector officials on season preparations on 18 November, at a meeting chaired by the Nuwara Eliya District Secretary, as this desk reported at the time.
Not reported
- The cost, funding source or contractor.
- How many crashes, injuries or deaths prompted the work, or which bends are the worst.
- How much has been installed so far, or how the 10.5 km is divided between the three roads.
On sourcing: single source, Hiru News (English desk, 11.11 a.m. Colombo time on 22 November). The Daily Mirror, NewsFirst and news.lk front pages showed no second report around noon. A web search turned up only earlier RDA guard-rail announcements for hill-country roads, dated 2025, which are not used here because they do not report this work.