Five-hour water cut for several Kandy-area localities on Friday
Supply to Kadugannawa, Gannoruwa, Mahakanda and six other areas stops from 7.30 a.m. to noon on 13 November for maintenance at the Kandy South plant.
Supply to Kadugannawa, Gannoruwa, Mahakanda and six other areas stops from 7.30 a.m. to noon on 13 November for maintenance at the Kandy South plant.
Supply will be suspended from 8.30 a.m. to 10 p.m. on 14 November for maintenance on the power system feeding the Biyagama Water Treatment Plant.
Non-revenue water reached 24.4% in the six months to June, the Finance Ministry's mid-year report shows, as NWSDB net profit fell 8.5% to Rs 16.2 billion.
A new US$200 million climate-resilient project joins the US$100 million reform tranche signed last week, in a package announced by the ADB on Monday.
NWSDB maintenance at Thuruwila plant will suspend water supply from 9 a.m. to 5 p.m. across eleven Anuradhapura areas.
Supply to Kalutara, Wadduwa, Waskaduwa, Moronthuduwa and Pilaminawatte stops from 9 a.m. to 5 p.m. on 8 October for maintenance at the Kehena treatment plant.
Supply to Uduwawala, Rajapihilla and Gonigoda stops at 9 a.m. on 6 October for maintenance at the Katugastota purification plant, returning 8 October.
The NWSDB will suspend supply from 8.30 a.m. to 4.30 p.m. on Wednesday in Ihala Gama, Kalawewa, Maradankadawala, Thirappane and Kekirawa.
The JICA-funded scheme will supply Colombo and Kalutara districts through a new 140,000 cubic metre per day treatment plant, storage towers and pipelines.
NWSDB launching three desalination projects to boost water supply in water-scarce areas.
Polonnaruwa villages face water crisis as residents travel kilometres daily while wells dry up during drought.
NWSDB Chairman Chandana Bandara says wells are under construction in Monaragala with Batticaloa to follow, as Ampara storage drops to 21.7 per cent.
The National Water Supply and Drainage Board is drilling more tube wells and expanding groundwater capacity ahead of a dry spell forecast for early 2027.
Transport permits become mandatory for pigs, sheep and goats, under one of two amendment bills passed by Parliament on Thursday.
NWSDB suspends supply to Wellawatte and Pamankada from 10pm tonight until 5am tomorrow for works under the Greater Colombo water improvement programme.
NWSDB suspending water supply across five Kandy schemes from 9.00 a.m. to 2.00 p.m. Thursday.
The NWSDB will suspend supply for between five and 16 hours on Tuesday for maintenance at the Kandana Water Treatment Plant. Piliyandala faces the longest cut.
Heavy rain has blocked the intake points feeding the Asupini Ella and Mawanella treatment plants, suspending supply across two Kegalle divisions.
Water supply to Kandy will be cut 9 a.m.–9 p.m. for urgent electrical maintenance at the Getambe treatment plant.
Water Supply Minister Susil Ranasinghe says Labugama and Kalatuwawa hold enough water for three months even without rain, ruling out cuts for now.
Minister Susil Ranasinghe says work has begun to expand the Horana-Kadana treatment plant and modernise the ageing Labugama-to-Colombo pipeline.
The National Water Supply and Drainage Board says it has no plans yet to restrict water supply, but will reconsider if reservoir levels fall sharply.
The NWSDB announced a four-hour water cut across Kandy District from 10am on July 22 for maintenance at the Kandy Main Water Supply Project.
A National Audit Office report says the NWSDB has run for 49 years with no formal water-tariff policy, having revised charges 17 times since 1990.